You don't have javascript enabled. Good luck with that.
Pencarian
35 Satgas SDA Pulogadung Bersihkan Saluran Air di Jl Pisangan Lama 2

Channel on Jalan Pisangan Lama 2 Drained

35 personnel of Pulogadung Sub-district Water Resources Taskforce are cleaning up a water channel on Jalan Pisangan Lama 2. 

This is a follow-up action after controlling. It is targeted to be finished on November 1

It is done, as the channel was previously full of 213 PKL stalls. It was controlled on October 17.

Channel on Jalan Cileduk Raya Cleaned

Pulogadung Sub-district Head, Bambang Pangestu stated that the channel is drained up to 350 meters length with 80 centimeters width.

"This is a follow-up action after controlling. It is targeted to be finished on November 10," he stated, Sunday (10/28).

Hopefully it would make the place more beautiful and would be free from inundation when it rains.

"PKL that have been netted will be relocated to Enjo Market," he said.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close