You don't have javascript enabled. Good luck with that.
Pencarian
Jalan Pesona Kalisari Longsor

Landslide Occurred on Jalan Pesona IX Kalisari

Heavy rain fall on yesterday afternoon in Jakarta caused landslide on Jalan Pesona IX, RT 07/05, Kalisari Urban Village, Pasar Rebo, East Jakarta. Currently, road can't be accessed due to this incident.

No one injured, our stuffs are also safe. But two motorcycles are still buried due to landslide

Based on collected information, landslide happened while heavy rain falls around 16.50 PM. Residents were startled by rumble sound because Jalan Pesona IX as wide as three meters was slid down. The road was immediately buried by soil materials until the road is completely cut off. Suwuk connecting channel was also clogged by debris.

This Morning, Landslides in Kalisari Handled

Due to this incident, RT 07/05 Head, Sarifudin's house is damaged and two of his motorcycles are also buried by landslide.

According to monitoring on the field, landslide occurred on the edge of Suwuk connecting channel. Jalan Pesone IX is a blind alley. Sarifudin's house is located on the end of this alley, right on a four meter high cliff.

He conveyed, his two children and himself are not on the location when this incident occurred. There are only his wife and household assistant.

"No one injured, our stuffs are also safe. But two motorcycles are still buried due to landslide," he stated, Monday (11/26) night.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1325 personFakhrizal Fakhri
  2. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1157 personDessy Suciati
  3. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye942 personNurito
  4. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye914 personBudhi Firmansyah Surapati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye845 personDessy Suciati