You don't have javascript enabled. Good luck with that.
Pencarian
Renovasi Enam Rusun di Jaktim Capai 90 Persen

December 20, Six Flats Renovation in E. Jakarta Completed

The moderate renovations progress on six flats in East Jakarta until now has reached 90 percent. It is targeted to be finished on December 20, 2018.

Renovations are more focused on flat infrastructures and facilities

East Jakarta Public Housing and Settlement Sub-dept. Head, Retno Sulistianingrum stated that those six flats are Albo Cakung Barat, Tipar Cakung, Pinus Elok, Jatinegara Kaum, Jatinegara Barat, and Cipinang Muara.

"Renovations are more focused on flat infrastructures and facilities," he told, Thursday (12/6).

Urban Farming Development Training Given to Komarudin Flat Occupants

Infrastructures repaired are such as fence, floor, ground floor, paving block, small mosque (musala), kiosk rolling door, motorcycle parking canopy, and new kiosk construction.

"We have spent at least Rp 9 billion through APBD 2018," he stated.

Linked News
Popular News indeks
  1. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye801 personFakhrizal Fakhri
  2. Transjakarta Modifies Mikrotrans Routes JAK 48A, JAK 50, and JAK 79

    access_time12-10-2026 remove_red_eye548 personAldi Geri Lumban Tobing
  3. Dengue Cases Decline in Jakarta as Prevention Efforts Intensify

    access_time16-10-2026 remove_red_eye523 personAldi Geri Lumban Tobing
  4. CiLung Festival Lets Visitors Ride Boats Made from Recycled Plastic Bottles

    access_time16-10-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  5. An-Nur Floating Mosque Opens After Years of Waiting

    access_time16-10-2026 remove_red_eye499 personFakhrizal Fakhri