You don't have javascript enabled. Good luck with that.
Pencarian
Pembangkit Listrik Tenaga Surya Bakal Dibangun di Pulau Sebira
.
photo Suparni - Beritajakarta.id

Solar Power Plant will Be Built in Sebira Island

We support this planning because PLTS can be a way to fulfill electricity needs of Sebira Island residents

Jakarta Industry and Energy (PE) Dept. and State Electricity Company (PLN) will build Solar Power Plant (PLTS) in Sebira Island, Harapan Island Urban Village, North Seribu Islands.

Seribu Islands Assistant in Economy and Development (Asekbang), Iwan Samosir stated, PLTS is one of the solutions to provide electricity for Sebira Island residents for 24 hours.

City to Hold FGD Related to Seribu Islands Electricity Needs

"We support this planning because PLTS can be a way to fulfill electricity needs of Sebira Island residents," he conveyed, Monday (12/10).

His side has surveyed the location where PLTS planned to be built which is near the soccer field in Sebira Island. Related to PE Dept.'s demand to Seribu Island PE Sub-dept to provide 6 thousand square meters land, this survey needs to involve related UKPDs since it involves appliance ownership, ownership validity, and spatial.

Meanwhile, Seribu Islands PE Sub-dept. Head, Melinda Sagala conveyed to continue fulfilling Sebira Island residents needs of electricity by operating diesel power plant (generator) from 14 hours into 18 hours a day. It has been done since early December.

"We will try to operate it 24 hours next year (2019). Moreover it will be supported by PLTS construction and I hope it could be realized soon," she said.

Linked News
Popular News indeks
  1. Duren Sawit PTSP Holds Door-to-Door Servies at Pondok Kelapa TPU until Thursday

    access_time15-05-2024 remove_red_eye641 personNurito
  2. Commission D: RDF Construction in Rorotan Has Many Benefits

    access_time13-05-2024 remove_red_eye524 personFolmer
  3. Tengah Urban Village PPSU Personnel Clean Fire Debris

    access_time10-05-2024 remove_red_eye515 personNurito
  4. Jalan YRS III Repairs in South Jakarta Completed

    access_time10-05-2024 remove_red_eye491 personTiyo Surya Sakti
  5. 35 Toddlers in Kedoya Selatan Received Assistance with Nutritious Additional Food

    access_time13-05-2024 remove_red_eye485 personTP Moan Simanjuntak