You don't have javascript enabled. Good luck with that.
Pencarian
Gubernur Resmikan Ratangga, Nama Baru Ketera MRT Jakarta

Anies Inaugurates Ratangga as The Name of MRT Train

Jakarta Governor, Anies Baswedan inaugurates Ratangga as the name of MRT Train Phase 1 for Lebak Bulus-Bundaran Hotel Indonesia (HI) route.

We hope Ratangga could be one of the solutions to solve traffic congestion

Ratangga is known from Old Javanese or Sanskrit language which means chariot. It was mentioned in a poem at Arjuna Wijaya Book and Sutasoma Book by Mpu Tantular.

This chariot is identical with fighters and strength. Thus, he hopes Ratangga could be a great transportation mode which is strong for citizens who strive for better life.

PT MRT Continues to Conduct Series of Train System Tests

He mentioned, this naming has been discussed together with grammar experts.

"Its message is clear, there is a power and struggle. This train users are the people who will struggle with toughness. MRT is also built by Indonesian people who are tough and full of spirit," he expressed after checking MRT operational readiness by using Ratangga from Bundaran HI to Lebak Bulus Depo, Monday (12/10).

According to him, Ratangga is not only a name but also brings a meaningful message.

"I hope all public facilitates in Jakarta and Indonesia could be given names that absorbs historical roots as Ratangga," he conveyed.

He explained, Ratangga is operated not only to improve people's mobility, but also to give other benefits such as improved air quality and lifestyle change for people to use public transportation more often.

"We hope Ratangga could be one of the solutions to solve traffic congestion," he mentioned.

PT. MRT Jakarta President Director, William Sabandar said, currently there are 16 sets of Ratangga Train that contains of six train cars for each train set.

"We will continue to do limited trials before it is fully operated in March 2019," he conveyed.

For information, Anies using Ratangga from Bundaran HI into Lebak Bulus Depot in 15 minutes without stopping at each stations.

Meanwhile, when it is operated, this train will stop at each stations from Lebak Bulus to Bundaran HI that has distance around 16 kilometers and targeted to finish one trip within 30 minutes.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1578 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1437 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1301 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1094 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye965 personDessy Suciati