You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Air di Kalibata Timur Mulai Dibangun

Water Channel Starts to Be Built on Jl. Kalibata Timur IV

Our target is to complete this channel in two weeks

New water channel starts to be built on Jalan Kalibata Timur IV, RT 10/08, Kalibata Urban Village, Pancoran, South Jakarta.

Kalibata Urban Village Head, Denny Isnandar mentioned, its building cost is Rp 100 million with support from one of BUMNs, PT. Rekayasa Industri's Corporate Social Responsibility (CSR).

20 Joint Personnel Deployed to Handle Inundation on Jl. Raya Fatmawati

"This channel will have 870 meters length. U-ditch will be also installed in the size 30x40 centimeters," he informed, Monday (12/17).

It is done, because it is located in basin area, which is prone to inundation when the rain falls.

"Our target is to complete this channel in two weeks. We hope it can make Jalan Kalibata Timur IV becomes free from inundation," he said.

During construction, Jalan Kalibata Timur IV at RT 02 and RT 08, RW 10, is opened and closed in situational way.

"We will divert the traffic flows as needed," he added.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5489 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4625 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1832 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1042 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1028 personFakhrizal Fakhri