You don't have javascript enabled. Good luck with that.
Pencarian
 Dinas PE Pasang PJU Menggunakan Tiang Gendong di Empat Lokasi Pedestrian

PE Dept. Installs PJUs with Dislocation Arms Type

It is surely more efficient and better in aesthetics

Jakarta Industry and Energy (PE) Dept. has new method by installing street lights (PJU)s with dislocation arms type (tiang gendong). It is applied to repair roads and sidewalk aesthetics in Jakarta. 

Jakarta PE Dept.'s Lighting Division Head, Syamsul Bakhri said, his side installs 200 PJUs with dislocation arms type on Jalan Ahmad Yani, 114 PJUs on Jalan Yos Sudarso, 171 PJUs on Jalan RE Martadinata, and 100 PJUs on Jalan Akses Rusun Pesakih.

PE Dept. Saves PJU Electric Cost Up to 51 Percent

Budget for PJU lamps installation is allocated Rp 3.9 billion, while on Jalan Yos Sudarso is Rp 3.6 billion, on Jalan RE Martadinata is Rp 4.6 billion, and in Jl. Akses Rusun Pesakih is Rp 1.7 billion.

"Lamp installation on Jalan RE Martadinata, Jalan Yos Sudarso, and Jalan Akses Rusun Pesakih is completed. Our target is to complete installation this week," he mentioned, Tuesday (12/18).

He explained, this type of PJU has two dislocated arms with two LED lamps.

"The lamp lights the road has 200 watts power and lamp lights the sidewalk has 80 watts power. It is surely more efficient and better in aesthetics," he stated.

Linked News
Popular News indeks
  1. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye758 personBudhi Firmansyah Surapati
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye741 personAldi Geri Lumban Tobing
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye669 personDessy Suciati
  4. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye621 personAldi Geri Lumban Tobing
  5. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye601 personAldi Geri Lumban Tobing