You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Ambrol di Ancol Dalam Tahap Penyelesaian

Collapsed Sheetpile Repair in Pademangan is Almost Complete

The collapsed sheetpile repair on the Ciliwung riverbank, RT 01/08 Ancol Urban Village, Pademangan, North Jakarta has entered finishing stage. It is targeted to be finished by the end of this year.

We're optimistic it can finish by the end of this year

Robert Rajagukguk, Section Head of River and Beach System stated that the finishing or second repair stage includes 50 meters length. The total repair of the sheetpile is up to 127 meters length.

Sheetpile Installed on the BGR Riverbank to Anticipate Inundation

"This repair work has touched 95 percent so far," he stated, Saturday (12/22).

The first repair stage that takes up to 77 square meters length was finished last November. It has been carried out since October 21, 2018.

"We're optimistic it can finish by the end of this year," he stressed.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1680 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye674 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye471 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye434 personDessy Suciati
  5. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye408 personDessy Suciati