You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Ambrol di Ancol Dalam Tahap Penyelesaian
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Collapsed Sheetpile Repair in Pademangan is Almost Complete

The collapsed sheetpile repair on the Ciliwung riverbank, RT 01/08 Ancol Urban Village, Pademangan, North Jakarta has entered finishing stage. It is targeted to be finished by the end of this year.

We're optimistic it can finish by the end of this year

Robert Rajagukguk, Section Head of River and Beach System stated that the finishing or second repair stage includes 50 meters length. The total repair of the sheetpile is up to 127 meters length.

Sheetpile Installed on the BGR Riverbank to Anticipate Inundation

"This repair work has touched 95 percent so far," he stated, Saturday (12/22).

The first repair stage that takes up to 77 square meters length was finished last November. It has been carried out since October 21, 2018.

"We're optimistic it can finish by the end of this year," he stressed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye353 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik