You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Ambrol di Ancol Dalam Tahap Penyelesaian

Collapsed Sheetpile Repair in Pademangan is Almost Complete

The collapsed sheetpile repair on the Ciliwung riverbank, RT 01/08 Ancol Urban Village, Pademangan, North Jakarta has entered finishing stage. It is targeted to be finished by the end of this year.

We're optimistic it can finish by the end of this year

Robert Rajagukguk, Section Head of River and Beach System stated that the finishing or second repair stage includes 50 meters length. The total repair of the sheetpile is up to 127 meters length.

Sheetpile Installed on the BGR Riverbank to Anticipate Inundation

"This repair work has touched 95 percent so far," he stated, Saturday (12/22).

The first repair stage that takes up to 77 square meters length was finished last November. It has been carried out since October 21, 2018.

"We're optimistic it can finish by the end of this year," he stressed.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye680 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye507 personAldi Geri Lumban Tobing
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye481 personFakhrizal Fakhri
  5. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye475 personAnita Karyati