You don't have javascript enabled. Good luck with that.
Pencarian
Turap Longsor di Jalan Layur Mulai Diperbaiki

Today, Collapsed Retaining Wall on Jalan Layur Repaired

Pulogadung Water Resources (SDA) Unit starts repairing collapsed channel retaining wall on Jalan Layur, Pulogadung, East Jakarta. This 17-meter retaining wall was collapsed on heavy rain day in mid-December.

We start the work today and our target is to finish it in the next three weeks

Indra, Head of Pulogading SDA unit mentioned to deploy 10 personnel to repair it. Currently, his side dredges the bottom part to build retaining wall foundation.

Pramuka Island PHB Channel's Retaining Wall Repaired

"We start the work today and our target is to finish it in the next three weeks. We use APBD 2019's self-management fund for this repair," he said, Friday (1/11).

That retaining wall was collapsed during heavy rain. Bamboos near the location were also fell on the fence of resident's house. This fence then also collapsed and hit the retaining wall which caused it to collapse.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5476 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4613 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1818 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1019 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1017 personFakhrizal Fakhri