You don't have javascript enabled. Good luck with that.
Pencarian
Ada Pengerjaan MRT, Jl Sudirman Diberlakukan Rekayasa Lalin

MRT Project, Traffic Engineering on Jalan Jenderal Sudirman Applied

It will end on January 24. While demolishment has been ongoing since 12 AM

PT MRT is applying traffic engineering on Jalan Jenderal Sudirman from Semanggi towards HI Roundabout. 

It aims to smoothen the demolishment work on a decking and reinstatement in the construction area of the Setiabudi MRT station's west entrance in front of Mid Plaza building.

941 Thousand MRT Tickets Ready To Use in March

"It will end on January 24. While demolishment has been ongoing since 12 AM," said PT MRT's Corporate Secretary Division Head, Muhamad Kamaluddin, Friday (1/18). 

For comfort and safety of road users, a number of signs such as lamps and information boards will also be installed.

"We've also been coordinating with police and Transportation Department by sending officers in the field to monitor and control traffic flow," he stated.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5468 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4605 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1810 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1014 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1003 personAldi Geri Lumban Tobing