You don't have javascript enabled. Good luck with that.
Pencarian
Ada Pengerjaan MRT, Jl Sudirman Diberlakukan Rekayasa Lalin

MRT Project, Traffic Engineering on Jalan Jenderal Sudirman Applied

It will end on January 24. While demolishment has been ongoing since 12 AM

PT MRT is applying traffic engineering on Jalan Jenderal Sudirman from Semanggi towards HI Roundabout. 

It aims to smoothen the demolishment work on a decking and reinstatement in the construction area of the Setiabudi MRT station's west entrance in front of Mid Plaza building.

941 Thousand MRT Tickets Ready To Use in March

"It will end on January 24. While demolishment has been ongoing since 12 AM," said PT MRT's Corporate Secretary Division Head, Muhamad Kamaluddin, Friday (1/18). 

For comfort and safety of road users, a number of signs such as lamps and information boards will also be installed.

"We've also been coordinating with police and Transportation Department by sending officers in the field to monitor and control traffic flow," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1577 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1437 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1301 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1094 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye965 personDessy Suciati