You don't have javascript enabled. Good luck with that.
Pencarian
MRT Masih Lakukan Studi Lokasi Depo Fase II
.
photo istimewa - Beritajakarta.id

MRT Phase II Depot Location Being Reviewed

PT. MRT Jakarta is still finding the best location for Mass Rapid Transit (MRT) Phase II (Bundaran HI-Kota route) Depot which is planned to be built in areas near Ancol, North Jakarta.

We are still studying several locations near Ancol to build MRT Phase II Depot

"We are still studying several locations near Ancol to build MRT Phase II Depot," mentioned William Sabandar, PT. MRT Jakarta President Director, Wednesday (1/23).

MRT Project, Traffic Engineering on Jalan Jenderal Sudirman Applied

It needs 9-hectare land to build MRT Depot.

"We are targeting to start its operation in 2024. Hopefully we could find the best location for depot in the near future," he conveyed.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye716 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye603 personFolmer
  3. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye287 personBudhi Firmansyah Surapati
  4. Transjakarta Ready to Support People's Mobility This Eid

    access_time30-03-2025 remove_red_eye253 personAldi Geri Lumban Tobing
  5. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye247 personTiyo Surya Sakti

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik