You don't have javascript enabled. Good luck with that.
Pencarian
MRT Masih Lakukan Studi Lokasi Depo Fase II

MRT Phase II Depot Location Being Reviewed

PT. MRT Jakarta is still finding the best location for Mass Rapid Transit (MRT) Phase II (Bundaran HI-Kota route) Depot which is planned to be built in areas near Ancol, North Jakarta.

We are still studying several locations near Ancol to build MRT Phase II Depot

"We are still studying several locations near Ancol to build MRT Phase II Depot," mentioned William Sabandar, PT. MRT Jakarta President Director, Wednesday (1/23).

MRT Project, Traffic Engineering on Jalan Jenderal Sudirman Applied

It needs 9-hectare land to build MRT Depot.

"We are targeting to start its operation in 2024. Hopefully we could find the best location for depot in the near future," he conveyed.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1295 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing