You don't have javascript enabled. Good luck with that.
Pencarian
MRT Masih Lakukan Studi Lokasi Depo Fase II
.
photo istimewa - Beritajakarta.id

MRT Phase II Depot Location Being Reviewed

PT. MRT Jakarta is still finding the best location for Mass Rapid Transit (MRT) Phase II (Bundaran HI-Kota route) Depot which is planned to be built in areas near Ancol, North Jakarta.

We are still studying several locations near Ancol to build MRT Phase II Depot

"We are still studying several locations near Ancol to build MRT Phase II Depot," mentioned William Sabandar, PT. MRT Jakarta President Director, Wednesday (1/23).

MRT Project, Traffic Engineering on Jalan Jenderal Sudirman Applied

It needs 9-hectare land to build MRT Depot.

"We are targeting to start its operation in 2024. Hopefully we could find the best location for depot in the near future," he conveyed.

Linked News
Popular News indeks
  1. Jakarta Fair Kemayoran Begins, Hailing City’s 498th Anniversary

    access_time20-06-2025 remove_red_eye358 personDessy Suciati
  2. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye282 personDessy Suciati
  3. Governor Pramono: Jakarta E-Prix 2025 in Ancol is Amazing!

    access_time21-06-2025 remove_red_eye263 personDessy Suciati
  4. Here are Parking Spaces around Lapangan Banteng for Jakarta's Anniversary

    access_time21-06-2025 remove_red_eye253 personAldi Geri Lumban Tobing
  5. Bank Jakarta Officially Launched, Aiming for IPO and Global Competitiveness

    access_time23-06-2025 remove_red_eye228 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik