You don't have javascript enabled. Good luck with that.
Pencarian
 Rp 3,1 Miliar Disiapkan Untuk Bangun Tiga Saluran Phb di Jaktim
.
photo Nurito - Beritajakarta.id

Three Connecting Channels to Be Built in East Jakarta

East Jakarta Water Resources (SDA) Sub-department has allocated Rp 3.1 billion from City Budget (APBD) 2019 to build three connecting (PHB) channels in East Jakarta. According to the plan, 160 meters channel will be built on Jalan Pondok Ranggon, 150 meters channel on Jalan Raya Asyafiiyah Cilangkap, and 110 meters channel on Jalan Mini I, II, III Bambu Apus.

We plan to start auction in March thus its construction could be started in May or June

"We plan to start auction in March thus its construction can be started in May or June," stated Mustajab, Head of East Jakarta SDA Sub-department, Saturday (2/9).

SDA Personnel Repair Kalibaru PHB Channel's Collapsed Retaining Wall

Most PHB channel is planned to have width of 80 centimeters and depth of 80 centimeters. Particularly on Jalan Mini I, II, and III its width reaches 1.2 meters. Then all channels use U-ditch concrete for its construction.

Linked News
Popular News indeks
  1. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye807 personTiyo Surya Sakti
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye792 personTP Moan Simanjuntak
  3. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye352 personTP Moan Simanjuntak
  4. Pembangunan Jaya Ancol Wins CSA Awards 2024

    access_time06-11-2024 remove_red_eye321 personAldi Geri Lumban Tobing
  5. Juaini Appreciates Public Services in Rawa Badak Utara Urban Village

    access_time07-11-2024 remove_red_eye307 personBudhi Firmansyah Surapati