You don't have javascript enabled. Good luck with that.
Pencarian
 Rp 3,1 Miliar Disiapkan Untuk Bangun Tiga Saluran Phb di Jaktim

Three Connecting Channels to Be Built in East Jakarta

East Jakarta Water Resources (SDA) Sub-department has allocated Rp 3.1 billion from City Budget (APBD) 2019 to build three connecting (PHB) channels in East Jakarta. According to the plan, 160 meters channel will be built on Jalan Pondok Ranggon, 150 meters channel on Jalan Raya Asyafiiyah Cilangkap, and 110 meters channel on Jalan Mini I, II, III Bambu Apus.

We plan to start auction in March thus its construction could be started in May or June

"We plan to start auction in March thus its construction can be started in May or June," stated Mustajab, Head of East Jakarta SDA Sub-department, Saturday (2/9).

SDA Personnel Repair Kalibaru PHB Channel's Collapsed Retaining Wall

Most PHB channel is planned to have width of 80 centimeters and depth of 80 centimeters. Particularly on Jalan Mini I, II, and III its width reaches 1.2 meters. Then all channels use U-ditch concrete for its construction.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye979 personAldi Geri Lumban Tobing
  2. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye950 personFakhrizal Fakhri
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye936 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye715 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye610 personAnita Karyati