You don't have javascript enabled. Good luck with that.
Pencarian
Posko Terpadu Mulai Didirikan di Terminal Rambutan

Integrated Post is Being Prepared in Kampung Rambutan Terminal

Integrated post and other supporting facilities are being built in Kampung Rambutan Terminal to ensure travelers safety and comfort ahead of homecoming period.

This integrated post will be opened from D-10 to D+7 of Eid

Kampung Rambutan Terminal Head, Thofik Winanto said to provide 10x8 meters integrated post for personnel on duty from TNI, police, Satpol PP, Health Department (Dinkes), Transportation Department (Dishub), Pramuka, Orari and others.

"This integrated post will be opened from D-10 to D+7 of Eid," he conveyed, Tuesday (5/21).

Malfunctioned Lights at Kampung Rambutan Terminal Repaired

Meanwhile for other supporting facilities such as toilets for disabled people, tactile paving, traffic signs installation, and parking area management are still on progress.

"We also coordinate with related sides to ensure security system, check homecomers health, and undergo ramp check," he added.

Jakarta Dishub's Terminal UPT Head, Muslim also conveyed that his side replaces 60 of 90 seats in Kampung Rambutan Terminal with the new one from last night to today.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye588 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye430 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye373 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
close