You don't have javascript enabled. Good luck with that.
Pencarian
Belasan Pasukan Biru Kuras Saluran Air di Kebon Jeruk

Mud Dredged from Channel in Duri Kepa Settlement

Kebon Jeruk Water Resources (SDA) Unit deployed 15 personnel to dredge mud from water channel at RT 03/12 settlement, Duri Kepa Urban Village, Kebon Jeruk on Tuesday (8/6).

We want to add its capacity by dredging the mud

Kebon Jeruk SDA Unit Head, Nurdin mentioned, this channel has 300 meters length with 60 centimeters wide. Since early August, his side has dredged around 50 cubic meters mud.

City Rivers and Channels Keep Being Dredged Optimally

"We want to add its capacity by dredging the mud. Thus later this channel can be functioned optimally to prevent inundation," he stated.

He informed, this location is prone to inundation. He reminds local residents to maintain it clean thus when the rain falls, water can flow optimally.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close