You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Phb Kelapa Hibrida Ditarget Rampung Dua Pekan
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Kelapa Hibrida PHB Channel Dredged to Anticipate Inundation

We use excavator to dredge it and 5 dump trucks to transport the mud

North Jakarta Water Resources (SDA) Sub-department cleans up Kelapa Hibrida Connecting Channel (PHB), Pegangsaan Dua, Kelapa Gading since yesterday. This work is targeting to finish within two weeks.

IPAL Damaged, Mudflow on Pramuka Island Dredged

Kelapa Gading SDA Sub-department Head, Rukmana informed, currently this PHB channel has 1 meter depth with 6 meters wide and 1,200 meters long.

"We use excavator to dredge it and 5 dump trucks to transport the mud," he added, Wednesday (7/31).

His side plans to add its depth up to 1.5 meters. Thus inundation can be prevented in area near Kelapa Hibrida during rainy season.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1146 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye844 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye820 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye774 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye752 personAldi Geri Lumban Tobing
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2024 All Rights Reserved