You don't have javascript enabled. Good luck with that.
Pencarian
Belasan Pasukan Biru Kuras Saluran Air di Kebon Jeruk

Mud Dredged from Channel in Duri Kepa Settlement

Kebon Jeruk Water Resources (SDA) Unit deployed 15 personnel to dredge mud from water channel at RT 03/12 settlement, Duri Kepa Urban Village, Kebon Jeruk on Tuesday (8/6).

We want to add its capacity by dredging the mud

Kebon Jeruk SDA Unit Head, Nurdin mentioned, this channel has 300 meters length with 60 centimeters wide. Since early August, his side has dredged around 50 cubic meters mud.

City Rivers and Channels Keep Being Dredged Optimally

"We want to add its capacity by dredging the mud. Thus later this channel can be functioned optimally to prevent inundation," he stated.

He informed, this location is prone to inundation. He reminds local residents to maintain it clean thus when the rain falls, water can flow optimally.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye995 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye981 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye940 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye717 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye613 personAnita Karyati