You don't have javascript enabled. Good luck with that.
Pencarian
bongkar jembatan sunter

Danau Sunter Utara Bridge Repaired

The repair will finish at the end of December

After having damaged since last May, the North Jakarta Public Works Sub-Department finally began to repair the bridge of Danau Sunter Utara. However before being repaired, the bridge would be demolished first and then be re-built.

As planned, bridge construction that had broken and collapsed will finish until at the end of this year.

Danau Sunter Bridge Unrepaired, Motorists Protest

All this time, people who want to cross had to use another bridge on Jalan Danau Sunter, Sunter Agung, Tanjung Priok.

"The repair will finish at the end of December," said Head of North Jakarta Road Public Works Sub-Department, Monang Ritonga, Wednesday (9/3).

Previously, such bridge had a length of 8 meters and 7 meters width. To restore its function, the length and its width would be made the same as before.

"We allocate Rp 1.8 billion to repair the bridge. While repair for the Sindang Bridge had to be delayed due to inadequate time," he exclaimed.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye790 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye697 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye636 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye547 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye444 personDessy Suciati