You don't have javascript enabled. Good luck with that.
Pencarian
bongkar jembatan sunter

Danau Sunter Utara Bridge Repaired

The repair will finish at the end of December

After having damaged since last May, the North Jakarta Public Works Sub-Department finally began to repair the bridge of Danau Sunter Utara. However before being repaired, the bridge would be demolished first and then be re-built.

As planned, bridge construction that had broken and collapsed will finish until at the end of this year.

Danau Sunter Bridge Unrepaired, Motorists Protest

All this time, people who want to cross had to use another bridge on Jalan Danau Sunter, Sunter Agung, Tanjung Priok.

"The repair will finish at the end of December," said Head of North Jakarta Road Public Works Sub-Department, Monang Ritonga, Wednesday (9/3).

Previously, such bridge had a length of 8 meters and 7 meters width. To restore its function, the length and its width would be made the same as before.

"We allocate Rp 1.8 billion to repair the bridge. While repair for the Sindang Bridge had to be delayed due to inadequate time," he exclaimed.

Linked News
Popular News indeks
  1. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye791 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye749 personAnita Karyati
  3. Transjakarta Extends Operating Hours for MCR Concert at JIS

    access_time22-11-2026 remove_red_eye630 personAldi Geri Lumban Tobing
  4. Jakarta Aims for Overall Championship at PON Beach Games

    access_time21-11-2026 remove_red_eye595 personBudhi Firmansyah Surapati
  5. Meet Boan, A Retired Teacher Crafting Traditional Betawi Masks

    access_time22-11-2026 remove_red_eye466 personNurito