You don't have javascript enabled. Good luck with that.
Pencarian
bongkar jembatan sunter

Danau Sunter Utara Bridge Repaired

The repair will finish at the end of December

After having damaged since last May, the North Jakarta Public Works Sub-Department finally began to repair the bridge of Danau Sunter Utara. However before being repaired, the bridge would be demolished first and then be re-built.

As planned, bridge construction that had broken and collapsed will finish until at the end of this year.

Danau Sunter Bridge Unrepaired, Motorists Protest

All this time, people who want to cross had to use another bridge on Jalan Danau Sunter, Sunter Agung, Tanjung Priok.

"The repair will finish at the end of December," said Head of North Jakarta Road Public Works Sub-Department, Monang Ritonga, Wednesday (9/3).

Previously, such bridge had a length of 8 meters and 7 meters width. To restore its function, the length and its width would be made the same as before.

"We allocate Rp 1.8 billion to repair the bridge. While repair for the Sindang Bridge had to be delayed due to inadequate time," he exclaimed.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1054 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye990 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye962 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye916 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye703 personAldi Geri Lumban Tobing