You don't have javascript enabled. Good luck with that.
Pencarian
“Pertama kali ambruk, jembatan langsung ditutup seng setelah itu tidak pernah ada perbaikan sama sek

Danau Sunter Bridge Unrepaired, Motorists Protest

The motorists passing the Danau Sunter Bridge on the north and south sides of Jalan Danau Sunter Utara, Tanjung Priok, North Jakarta, are expressing their protest. They demand related unit to immediately repair the bridge that was collapsed four months ago, precisely at the end of last April.

Locals were immediately covering the bridge with zinc when the bridge collapsed. Until now, there is no repair from related unit

As quoted by beritajakarta.com, thus far the bridge near the Office of Education, Training and Improvement in Shipping Sciences (BP3IP) is still covered with zinc propped up by rocks and woods on each side. However the motorists recklessly use the bridge due to the zinc leaves the space to be passed.

"Locals were immediately covering the bridge with zinc when the bridge collapsed. Until now, there is no repair from related unit," explained Narto, a motorcycle-driver on Jalan Danau Sunter, Saturday (8/9).

He explained that the roads covered by zinc already started to sinkhole, in which its iron bridge buffer has declined and almost touching the water surface. It happens because many motorists pass through the road.

Head of North Jakarta Road Public Works Sub-Department, Moand Ritonga mentions repair plan is currently still being auctioned. The auction filed on May 7 should obeyed the new program of the Goods and Services Procurement Unit (ULP), thus its process takes a long.

"We have to obey the rules thus the auction process takes a long," he explained.

His sub-department promised would immediately repair the bridge after auction is done. "Don't worry we will repair the bridge soon," he finished.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1581 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1438 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1302 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1095 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye966 personDessy Suciati