You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Sistem Interceptor di Kawasan Kali Item Mulai Dikerjakan

PAL Jaya Constructs IPAL with Interceptor System in Kemayoran

Construction of wastewater treatment (IPAL) with interceptor system in Serdang, Kemayoran, Central Jakarta is targeted to complete by the end of October.

We construct it in two locations

PD. PAL Jaya President Director, Subekti said, construction has been started since last Saturday (9/21). This construction is a part of Regional Strategic Program (KSD) 2019.

"We construct it in two locations, Kemayoran Sub-district Office's yard and SDA Department's pump house on Jalan Delta, RW 07 Serdang," he informed, Monday (9/23).

Rp 68 Billion Prepared for MBBR IPAL Development at Krukut Pump House

PD. PAL Jaya Kali Item (Black River) Wastewater Treatment Pilot Project PPK, Johan Supandi expected, this pilot project can be accepted by public and it can be implemeted well in accordance with the provisions.

"Hopefully it can work well," he conveyed.

Linked News
Popular News indeks
  1. BI and Jakarta Government Deepen Investment, Creative Economy Collaboration

    access_time09-11-2026 remove_red_eye534 personAldi Geri Lumban Tobing
  2. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye496 personFakhrizal Fakhri
  3. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye488 personFakhrizal Fakhri
  4. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye487 personAldi Geri Lumban Tobing
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye475 personTiyo Surya Sakti