You don't have javascript enabled. Good luck with that.
Pencarian
PD PAL Jaya Akan Bangun IPAL Berteknologi MBBR di Rumah Pompa Krukut
.
photo Wuri Setyaningsih - Beritajakarta.id

Rp 68 Billion Prepared for MBBR IPAL Development at Krukut Pump House

The city-owned sewerage company PD PAL Jaya has aside Rp 68 billion to develop a waste water treatment plant (IPAL) with a moving bed biological reactor (MBBR) system at the Krukut Pump House, South Jakarta.

The development itself consists of mechanical electrical and civil buildings, for example blower pumps and electrical panels. This will take around 18 months

PD PAL Jaya President Director, Subekti stated the company is processing a Building Permit (IMB) in the South Jakarta PTSP Sub-agency office. Its development is through a third party.

"This month, we have a contract with them (third party) to do a groundbreaking this month. The IPAL will accommodate waste from Senayan, Gatot Subroto and SCBD areas," he expressed, Wednesday (9/18).

PD PAL Jaya - South Gippsland Water to Work as Team

It is also made to improve the quality of processed waste that has processing capacity up to 100 liters per second.

"The development itself consists of mechanical electrical and civil buildings, for example blower pumps and electrical panels. This will take around 18 months," he closed.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye553 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye445 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti