You don't have javascript enabled. Good luck with that.
Pencarian
PD PAL Jaya Akan Bangun IPAL Berteknologi MBBR di Rumah Pompa Krukut
.
photo Wuri Setyaningsih - Beritajakarta.id

Rp 68 Billion Prepared for MBBR IPAL Development at Krukut Pump House

The city-owned sewerage company PD PAL Jaya has aside Rp 68 billion to develop a waste water treatment plant (IPAL) with a moving bed biological reactor (MBBR) system at the Krukut Pump House, South Jakarta.

The development itself consists of mechanical electrical and civil buildings, for example blower pumps and electrical panels. This will take around 18 months

PD PAL Jaya President Director, Subekti stated the company is processing a Building Permit (IMB) in the South Jakarta PTSP Sub-agency office. Its development is through a third party.

"This month, we have a contract with them (third party) to do a groundbreaking this month. The IPAL will accommodate waste from Senayan, Gatot Subroto and SCBD areas," he expressed, Wednesday (9/18).

PD PAL Jaya - South Gippsland Water to Work as Team

It is also made to improve the quality of processed waste that has processing capacity up to 100 liters per second.

"The development itself consists of mechanical electrical and civil buildings, for example blower pumps and electrical panels. This will take around 18 months," he closed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. Second Pilkada 2024 Debate Theme Set, Don't Miss It

    access_time26-10-2024 remove_red_eye776 personAldi Geri Lumban Tobing
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye453 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye389 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye369 personAldi Geri Lumban Tobing