You don't have javascript enabled. Good luck with that.
Pencarian
PD PAL Jaya Akan Bangun IPAL Berteknologi MBBR di Rumah Pompa Krukut

Rp 68 Billion Prepared for MBBR IPAL Development at Krukut Pump House

The city-owned sewerage company PD PAL Jaya has aside Rp 68 billion to develop a waste water treatment plant (IPAL) with a moving bed biological reactor (MBBR) system at the Krukut Pump House, South Jakarta.

The development itself consists of mechanical electrical and civil buildings, for example blower pumps and electrical panels. This will take around 18 months

PD PAL Jaya President Director, Subekti stated the company is processing a Building Permit (IMB) in the South Jakarta PTSP Sub-agency office. Its development is through a third party.

"This month, we have a contract with them (third party) to do a groundbreaking this month. The IPAL will accommodate waste from Senayan, Gatot Subroto and SCBD areas," he expressed, Wednesday (9/18).

PD PAL Jaya - South Gippsland Water to Work as Team

It is also made to improve the quality of processed waste that has processing capacity up to 100 liters per second.

"The development itself consists of mechanical electrical and civil buildings, for example blower pumps and electrical panels. This will take around 18 months," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close