PAL Jaya Constructs IPAL with Interceptor System in Kemayoran
access_time September 23 2019 09:05 PM remove_red_eye 1037
Reported by Wuri Setyaningsih | Translated by Maria Inggita
Reported by Wuri Setyaningsih | Translated by Maria Inggita
Construction of wastewater treatment (IPAL) with interceptor system in Serdang, Kemayoran, Central Jakarta is targeted to complete by the end of October.
We construct it in two locations
PD. PAL Jaya President Director, Subekti said, construction has been started since last Saturday (9/21). This construction is a part of Regional Strategic Program (KSD) 2019.
"We construct it in two locations, Kemayoran Sub-district Office's yard and SDA Department's pump house on Jalan Delta, RW 07 Serdang," he informed, Monday (9/23).
Rp 68 Billion Prepared for MBBR IPAL Development at Krukut Pump HousePD. PAL Jaya Kali Item (Black River) Wastewater Treatment Pilot Project PPK, Johan Supandi expected, this pilot project can be accepted by public and it can be implemeted well in accordance with the provisions.
"Hopefully it can
work well," he conveyed.