You don't have javascript enabled. Good luck with that.
Pencarian
 Renovasi Gedung Bawaslu DKI Ditarget Rampung Desember
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

December, Bawaslu Building Renovation Completed

We also do it to make it look more comfortable

The Election Supervisory Agency (Bawaslu) building renovation on Jalan Danau Agung 2, Sunter Agung Urban Village, Tanjung Priok, North Jakarta is targeted to be completed in December.

North Jakarta Dukcapil Building Renovation Planned to Finish in November

North Jakarta City Asset Management Agency (SBPAK) Head Ratna Diah Kurniati said renovated parts of the building include the toilet, building roof and room arrangement. The building will also have a mushola (prayer room).

"While awaiting this renovation, we prepare PE Building in MT Haryono," he expressed, Tuesday (10/1).

The renovation that has been conducted since mid-September is done, as the building condition has been damaged.

"We also do it to make it look more comfortable," he stated.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye551 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye445 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti