You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran di Jl Simponi Mas Kelapa Gading Rampung

Channel Normalization on Jl. Simponi Mas Kelapa Gading Completed

North Jakarta Water Resources (SDA) Sub-department has completed the channel normalization project on Jalan Simponi Mas, RW 08 Pegangsaan Dua Urban Village, Kelapa Gading.

This project started from early September and finished today

Kelapa Gading SDA Unit Head, Rukmana mentioned, channel's condition before normalization was severely damaged in some parts and made it not optimal in storing water during rainy season.

"Normalization is done to follow up resident's complaint. Some parts of its retaining wall collapsed and its material blocked the water flow," he explained, Thursday (10/3).

West Jakarta Prepares 37 Pump Houses to Face the Upcoming Rainy Season

His side used river stone material with plaster and strengthen it with sloof on the both channel sides as long as 240 meters.

"This project started from early September and finished today. Hopefully this normalization can solve inundation problem at RW 08 Pegangsaan Dua," he asserted.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye659 personTiyo Surya Sakti
  3. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye369 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye362 personDessy Suciati
close