You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Saluran Phb Kayu Putih Dimulai
.
photo Nurito - Beritajakarta.id

Kayu Putih Sheet Pile in Pulogadung Repaired

This sheet pile is repaired after being crushed by high water flow

The East Jakarta Water Resources Sub-agency targets to finish the repair of the Kayu Putih connecting channel's sheet Pile, Pulogadung in the forthcoming December. It has been carried out since September 12.

"This sheet pile is repaired after being crushed by high water flow," said East Jakarta Water Resources Sub-agency Head, Santo, Wednesday (10/2).

Sheet Pile Installation on Sentiong River Has Reached 23 Percent

Technically it is done from the Sunter River until Kampung Ambon, Kayu Putih as long as 2.5 kilometers.

To speed up it, three heavy equipments type backhoe for excavating land and 300 personnel have been deployed to the location.

"We use river rocks to repair for long durability," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1037 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye903 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing