You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Saluran Phb Kayu Putih Dimulai

Kayu Putih Sheet Pile in Pulogadung Repaired

This sheet pile is repaired after being crushed by high water flow

The East Jakarta Water Resources Sub-agency targets to finish the repair of the Kayu Putih connecting channel's sheet Pile, Pulogadung in the forthcoming December. It has been carried out since September 12.

"This sheet pile is repaired after being crushed by high water flow," said East Jakarta Water Resources Sub-agency Head, Santo, Wednesday (10/2).

Sheet Pile Installation on Sentiong River Has Reached 23 Percent

Technically it is done from the Sunter River until Kampung Ambon, Kayu Putih as long as 2.5 kilometers.

To speed up it, three heavy equipments type backhoe for excavating land and 300 personnel have been deployed to the location.

"We use river rocks to repair for long durability," he stated.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1457 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1250 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1119 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye996 personFolmer
  5. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye891 personAldi Geri Lumban Tobing