You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Saluran Phb Kayu Putih Dimulai
.
photo Nurito - Beritajakarta.id

Kayu Putih Sheet Pile in Pulogadung Repaired

This sheet pile is repaired after being crushed by high water flow

The East Jakarta Water Resources Sub-agency targets to finish the repair of the Kayu Putih connecting channel's sheet Pile, Pulogadung in the forthcoming December. It has been carried out since September 12.

"This sheet pile is repaired after being crushed by high water flow," said East Jakarta Water Resources Sub-agency Head, Santo, Wednesday (10/2).

Sheet Pile Installation on Sentiong River Has Reached 23 Percent

Technically it is done from the Sunter River until Kampung Ambon, Kayu Putih as long as 2.5 kilometers.

To speed up it, three heavy equipments type backhoe for excavating land and 300 personnel have been deployed to the location.

"We use river rocks to repair for long durability," he stated.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1208 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1052 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye905 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye730 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye577 personDessy Suciati