You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap Roboh di Kali Betik Rampung

Repair on Betik River's Retaining Wall Completed

Not only collapsed but other parts are also damaged

Collapsed retaining wall of Betik River, Pegangsaan Dua Urban Village, Kelapa Gading, North Jakarta that was repaired since September 10 has now been completed.

Kelapa Gading Water Resources (SDA)'s Kelapa Gading Unit Head, Rukmana stated, retaining wall was collapsed around 10 meters long and caused 43 parts of the retaining wall damaged.

Kali Baru's Retaining Wall in Kramat Jati Repaired

"Not only collapsed but other parts are also damaged thus we need to repair it immediately before it gets worse," he explained, Monday (10/21).

His side repaired east side of the retaining wall using dolken wood piles, river stones, and plaster then strengthen it with horizontal and vertical sloofs.

"Yesterday, we finished repairing it. Today is only the finishing," he stated.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye747 personFakhrizal Fakhri
  2. Jakarta Regional Budget Spending Reaches Rp10.38 Trillion in Q1

    access_time17-04-2026 remove_red_eye696 personDessy Suciati
  3. Job Absorption Rises in Jakarta

    access_time17-04-2026 remove_red_eye596 personDessy Suciati
  4. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye586 personTiyo Surya Sakti
  5. Training and Certification Boost Tourism Workforce Competitiveness

    access_time17-04-2026 remove_red_eye570 personAldi Geri Lumban Tobing