You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap Kali Baru di Kramat Jati Rampung

Kali Baru's Retaining Wall in Kramat Jati Repaired

East Jakarta Water Resources (SDA) Sub-department has completed repair on Kali Baru River retaining wall as long as 10 meters, RW 01, Tengah Urban Village, Kramat Jati.

Besides, we will make it more stronger and sturdy by installing sandbags and river stones

Kramat Jati SDA Unit Head, Muchlis stated, formerly this retaining wall was collapsed and unable to accommodate more water.

"We deploy 25 personnel from SDA Sub-department and Tengah Urban Village PPSU personnel. It is a temporary repair because later it will be continued by Jakarta SDA Department's East Stream Field," he explained, Monday (10/14).

Joint Personnel Clean Up Debris from Collapsed Kali Jati PHB Retaining Wall

According to him, SDA Department will repair it permanently using concrete after water level is low. His side will also install dolken wood piles as long as 20 meters.

"Besides, we will make it more stronger and sturdy by installing sandbags and river stones," he conveyed.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye973 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye728 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye708 personAldi Geri Lumban Tobing
  4. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye582 personAldi Geri Lumban Tobing
  5. Five New Garbage Trucks Operated at Kramat Jati Market

    access_time01-05-2026 remove_red_eye576 personNurito