You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Enam Trotoar Ramah Disabilitas di Jakut Rampung November

North Jakarta to Have Six Disability-friendly Sidewalks in November

It has been carried out since June 14 and has reached 88 percent

The disability-friendly sidewalk construction on six roads in North Jakarta keeps being accelerated and is targeted to be complete in mid-November.

Disability-friendly Sidewalk Project in West Jakarta Intensified

Those sidewalks are on Jalan Danau Sunter Utara, Jalan Lodan Raya, Jalan RE Martadinata, Jalan Pluit Timur, Jalan Dadap Raya and Jalan Kamal Muara with a total construction along 10.1 kilometers.

"It has been carried out since June 14 and has reached 88 percent," North Jakarta Bina Marga Sub-agency's Road Infrastructure and Utility Network Completeness Division Head Libertus Sagala, Thursday (10/24).

He details the sidewalk construction includes guide tiles, safety bollards and park benches. While the construction material is from decorative concrete with attention to aspects of the beauty or aesthetics of the city.

"Then the sidewalk footprint is made as comfortable as possible, especially in the inrit section of access in and out of buildings or housing," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close