You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Enam Trotoar Ramah Disabilitas di Jakut Rampung November

North Jakarta to Have Six Disability-friendly Sidewalks in November

It has been carried out since June 14 and has reached 88 percent

The disability-friendly sidewalk construction on six roads in North Jakarta keeps being accelerated and is targeted to be complete in mid-November.

Disability-friendly Sidewalk Project in West Jakarta Intensified

Those sidewalks are on Jalan Danau Sunter Utara, Jalan Lodan Raya, Jalan RE Martadinata, Jalan Pluit Timur, Jalan Dadap Raya and Jalan Kamal Muara with a total construction along 10.1 kilometers.

"It has been carried out since June 14 and has reached 88 percent," North Jakarta Bina Marga Sub-agency's Road Infrastructure and Utility Network Completeness Division Head Libertus Sagala, Thursday (10/24).

He details the sidewalk construction includes guide tiles, safety bollards and park benches. While the construction material is from decorative concrete with attention to aspects of the beauty or aesthetics of the city.

"Then the sidewalk footprint is made as comfortable as possible, especially in the inrit section of access in and out of buildings or housing," he stated.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5402 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4553 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1754 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye989 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye918 personAldi Geri Lumban Tobing