You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Ajak Media Untuk Simulasi Pemasangan Flood dan Tap QR Code

PT MRT Simulates Installation of Flood Barriers at BNI Dukuh Atas Station

Its installation only takes four minutes

The city-owned operator PT MRT Jakarta invited the mass media crews to see firsthand the simulation of installing a flood barrier tool at BNI Dukuh Atas Station, on Thursday (1/30).

This flood barrier was placed in a storage area near the entrance of each MRT station that has one meter height and consisted of four lines. Thus if there is a puddle, the device can be installed immediately.

PT MRT - BNPP Improves Human Resource Competencies Emergency Response

"Its installation only takes four minutes. The simulation itself is done once a month," expressed PT MRT Jakarta Operational Director, Rahmat Effendi.

Aside that, the media crews were also given the opportunity to tap QR code with the Jakarta MRT app via a smartphone.

"For taping with QR code only takes 0.3 seconds, so it's faster and easier," he closed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1084 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye563 personDessy Suciati
  3. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye468 personAldi Geri Lumban Tobing
  4. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye468 personBudhi Firmansyah Surapati
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye452 personNurito