You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Ajak Media Untuk Simulasi Pemasangan Flood dan Tap QR Code

PT MRT Simulates Installation of Flood Barriers at BNI Dukuh Atas Station

Its installation only takes four minutes

The city-owned operator PT MRT Jakarta invited the mass media crews to see firsthand the simulation of installing a flood barrier tool at BNI Dukuh Atas Station, on Thursday (1/30).

This flood barrier was placed in a storage area near the entrance of each MRT station that has one meter height and consisted of four lines. Thus if there is a puddle, the device can be installed immediately.

PT MRT - BNPP Improves Human Resource Competencies Emergency Response

"Its installation only takes four minutes. The simulation itself is done once a month," expressed PT MRT Jakarta Operational Director, Rahmat Effendi.

Aside that, the media crews were also given the opportunity to tap QR code with the Jakarta MRT app via a smartphone.

"For taping with QR code only takes 0.3 seconds, so it's faster and easier," he closed.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1294 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1125 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye836 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing