You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Ajak Media Untuk Simulasi Pemasangan Flood dan Tap QR Code
.
photo Wuri Setyaningsih - Beritajakarta.id

PT MRT Simulates Installation of Flood Barriers at BNI Dukuh Atas Station

Its installation only takes four minutes

The city-owned operator PT MRT Jakarta invited the mass media crews to see firsthand the simulation of installing a flood barrier tool at BNI Dukuh Atas Station, on Thursday (1/30).

This flood barrier was placed in a storage area near the entrance of each MRT station that has one meter height and consisted of four lines. Thus if there is a puddle, the device can be installed immediately.

PT MRT - BNPP Improves Human Resource Competencies Emergency Response

"Its installation only takes four minutes. The simulation itself is done once a month," expressed PT MRT Jakarta Operational Director, Rahmat Effendi.

Aside that, the media crews were also given the opportunity to tap QR code with the Jakarta MRT app via a smartphone.

"For taping with QR code only takes 0.3 seconds, so it's faster and easier," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye541 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing