You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Ajak Media Untuk Simulasi Pemasangan Flood dan Tap QR Code
.
photo Wuri Setyaningsih - Beritajakarta.id

PT MRT Simulates Installation of Flood Barriers at BNI Dukuh Atas Station

Its installation only takes four minutes

The city-owned operator PT MRT Jakarta invited the mass media crews to see firsthand the simulation of installing a flood barrier tool at BNI Dukuh Atas Station, on Thursday (1/30).

This flood barrier was placed in a storage area near the entrance of each MRT station that has one meter height and consisted of four lines. Thus if there is a puddle, the device can be installed immediately.

PT MRT - BNPP Improves Human Resource Competencies Emergency Response

"Its installation only takes four minutes. The simulation itself is done once a month," expressed PT MRT Jakarta Operational Director, Rahmat Effendi.

Aside that, the media crews were also given the opportunity to tap QR code with the Jakarta MRT app via a smartphone.

"For taping with QR code only takes 0.3 seconds, so it's faster and easier," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye866 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye422 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye369 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye354 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye347 personAldi Geri Lumban Tobing
close