You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Ajak Media Untuk Simulasi Pemasangan Flood dan Tap QR Code

PT MRT Simulates Installation of Flood Barriers at BNI Dukuh Atas Station

Its installation only takes four minutes

The city-owned operator PT MRT Jakarta invited the mass media crews to see firsthand the simulation of installing a flood barrier tool at BNI Dukuh Atas Station, on Thursday (1/30).

This flood barrier was placed in a storage area near the entrance of each MRT station that has one meter height and consisted of four lines. Thus if there is a puddle, the device can be installed immediately.

PT MRT - BNPP Improves Human Resource Competencies Emergency Response

"Its installation only takes four minutes. The simulation itself is done once a month," expressed PT MRT Jakarta Operational Director, Rahmat Effendi.

Aside that, the media crews were also given the opportunity to tap QR code with the Jakarta MRT app via a smartphone.

"For taping with QR code only takes 0.3 seconds, so it's faster and easier," he closed.

Linked News
Popular News indeks
  1. Jakarta Endorses New Housing Project for Residents on Railway Embankments

    access_time28-03-2026 remove_red_eye2402 personDessy Suciati
  2. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye786 personTiyo Surya Sakti
  3. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye695 personDessy Suciati
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye631 personTiyo Surya Sakti
  5. Jakarta Environmental Sub-agency Clears Trash Buildup at Kramat Jati Wholesale Market

    access_time28-03-2026 remove_red_eye462 personNurito