PT MRT Simulates Installation of Flood Barriers at BNI Dukuh Atas Station
access_time January 31 2020 05:04 PM remove_red_eye 1363
Reported by Wuri Setyaningsih | Translated by Nugroho Adibrata
Reported by Wuri Setyaningsih | Translated by Nugroho Adibrata
Its installation only takes four minutes
The city-owned operator PT MRT Jakarta invited the mass media crews to see firsthand the simulation of installing a flood barrier tool at BNI Dukuh Atas Station, on Thursday (1/30).
This flood barrier was placed in a storage area near the entrance of each MRT station that has one meter height and consisted of four lines. Thus if there is a puddle, the device can be installed immediately.
PT MRT - BNPP Improves Human Resource Competencies Emergency Response"Its installation only takes four minutes. The simulation itself is done once a month," expressed PT MRT Jakarta Operational Director, Rahmat Effendi.
Aside that, the media crews were also given the opportunity to tap QR code with the Jakarta MRT app via a smartphone.
"For taping with QR code only takes 0.3 seconds, so it's faster and easier," he closed.