You don't have javascript enabled. Good luck with that.
Pencarian
Turap Longsor di Batu Ampar Diperbaiki
.
photo Nurito - Beritajakarta.id

Collapsed Sheet Pile in Batu Ampar Repaired

A collapsed sheet pile on the Induk Gang Kambing River, RW 01, Batu Ampar Urban Village, Kramat Jati was repaired by 25 joint personnel of Bina Marga and PPSU, on Monday (3/2). 

This collapse occurred, as it was often eroded by water flow

"This collapse occurred, as it was often eroded by water flow," said Batu Ampar Urban Village Head Achmad Ruslan.

He stated that repair aimed to anticipate another landslide. Moreover the sheet pile location was near a bridge connecting RW 01 and 06.

Collapsed Road in Matraman Has Been Repaired

"If it is ignored, it will endanger the condition of nearby bridges," he expressed.

Linked News
Popular News indeks
  1. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye588 personFolmer
  2. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye571 personDessy Suciati
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye430 personAldi Geri Lumban Tobing
  4. Residents Hope Another Free Homecoming Program Held Next Year

    access_time27-03-2025 remove_red_eye315 personDessy Suciati
  5. Odd-Even Policy in Jakarta Put on Hold for Eid Break

    access_time28-03-2025 remove_red_eye281 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik