You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap Batu Kali PHB Ciliwung Rampung
.
photo Mustaqim Amna - Beritajakarta.id

Ciliwung PHB Retaining Wall has Been Repaired

South Jakarta Water Resources (SDA) Sub-agency has completed repair of Ciliwung connecting (PHB) channel's retaining wall on Jalan Asem Baris Raya, Kebon Baru, Tebet.

We start the repair from February 24 until April 26

South Jakarta SDA's Maintenance Section Head, Junjung conveyed, this retaining wall has length 26 meters and height 15 meters. His side completed the repair within 3 months. 

"We start the repair from February 24 until April 26. Previously, it was collapsed due to porous wall," he mentioned, Thursday (4/30).

Kawi-Kawi Channel's Retaining Wall in Johar Baru Being Repaired

During the repair, he continued, his side deployed 1 excavator and 1 dump truck to transport the material, as well as 25 personnel and the other 5 personnel from Tebet SDA Unit.

"I hope this repair can be useful for residents near the location, especially to prevent flood and landslide," he closed.

Linked News
Popular News indeks
  1. UK Royal Marine Band Enlivens Jakarta Anniversary

    access_time27-06-2025 remove_red_eye452 personDessy Suciati
  2. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye402 personTiyo Surya Sakti
  3. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye368 personAldi Geri Lumban Tobing
  4. Transjakarta Wins Award for Best GCG Company

    access_time27-06-2025 remove_red_eye341 personAldi Geri Lumban Tobing
  5. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye331 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik