Sunter River's retaining wall repair that is located at RT 12/13, Cipinang Muara, Jatinegara, East Jakarta has reached 75 percent, on Thursday (3/12). Water level on the river often rises thus it inhibits the repair.

We repair it using river stones and piles of dolken woods

Jatinegara Water Resources (SDA) Unit personnel, Tamrizal conveyed, his side has started the repair since end of February.

"Retaining wall as long as 30 meters with height of 4 meters was collapsed thus we repair it using river stones and piles of dolken woods," he said.

Krukut River's Retaining Wall in Pela Mampang Repaired

He couldn't tell when the repair could be finished because he had to stop the work when water level rose. Besides, his side needs to share the material with other units who repair another retaining walls in different locations in East Jakarta.

"We only repair it temporarily to prevent it from collapsing again. Only BBWSCC that has the authority to install the sheet piles and repair it permanently," he conveyed.

Linked News
Popular News indeks
  1. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye795 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye754 personAnita Karyati
  3. Transjakarta Extends Operating Hours for MCR Concert at JIS

    access_time22-11-2026 remove_red_eye631 personAldi Geri Lumban Tobing
  4. Jakarta Aims for Overall Championship at PON Beach Games

    access_time21-11-2026 remove_red_eye597 personBudhi Firmansyah Surapati
  5. Meet Boan, A Retired Teacher Crafting Traditional Betawi Masks

    access_time22-11-2026 remove_red_eye470 personNurito