You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Longsor Kali Sunter di Cipinang Muara Capai 75 Persen

Progress in Repairing Sunter River's Retaining Wall Reaches 75 Percent

Sunter River's retaining wall repair that is located at RT 12/13, Cipinang Muara, Jatinegara, East Jakarta has reached 75 percent, on Thursday (3/12). Water level on the river often rises thus it inhibits the repair.

We repair it using river stones and piles of dolken woods

Jatinegara Water Resources (SDA) Unit personnel, Tamrizal conveyed, his side has started the repair since end of February.

"Retaining wall as long as 30 meters with height of 4 meters was collapsed thus we repair it using river stones and piles of dolken woods," he said.

Krukut River's Retaining Wall in Pela Mampang Repaired

He couldn't tell when the repair could be finished because he had to stop the work when water level rose. Besides, his side needs to share the material with other units who repair another retaining walls in different locations in East Jakarta.

"We only repair it temporarily to prevent it from collapsing again. Only BBWSCC that has the authority to install the sheet piles and repair it permanently," he conveyed.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2625 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2028 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye963 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye825 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye727 personBudhi Firmansyah Surapati