You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap Batu Kali PHB Ciliwung Rampung

Ciliwung PHB Retaining Wall has Been Repaired

South Jakarta Water Resources (SDA) Sub-agency has completed repair of Ciliwung connecting (PHB) channel's retaining wall on Jalan Asem Baris Raya, Kebon Baru, Tebet.

We start the repair from February 24 until April 26

South Jakarta SDA's Maintenance Section Head, Junjung conveyed, this retaining wall has length 26 meters and height 15 meters. His side completed the repair within 3 months. 

"We start the repair from February 24 until April 26. Previously, it was collapsed due to porous wall," he mentioned, Thursday (4/30).

Kawi-Kawi Channel's Retaining Wall in Johar Baru Being Repaired

During the repair, he continued, his side deployed 1 excavator and 1 dump truck to transport the material, as well as 25 personnel and the other 5 personnel from Tebet SDA Unit.

"I hope this repair can be useful for residents near the location, especially to prevent flood and landslide," he closed.

Linked News
Popular News indeks
  1. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye803 personAldi Geri Lumban Tobing
  2. Jakarta Residents Welcome Rp1 Public Transport Fare

    access_time24-04-2026 remove_red_eye627 personNurito
  3. Limiting Gadget Use in Schools Expected to Boost Interaction and Reading Habits

    access_time24-04-2026 remove_red_eye597 personFakhrizal Fakhri
  4. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye576 personBudhi Firmansyah Surapati
  5. PT JIEP Targets Shenzhen Businesses with Investment Offers

    access_time24-04-2026 remove_red_eye568 personAldi Geri Lumban Tobing