You don't have javascript enabled. Good luck with that.
Pencarian
Kereta LRT Jakarta Longgarkan Operasional Dimasa Transisi hi

LRT Operations Extended During PSBB Transition

PT LRT Jakarta has decided to extend its services at 5.30 AM to 9 PM in the PSBB transition to end of June in the capital. 

We still consistently implement health protocols for the passengers

"Previously we only operated from 6 AM to 6.20 PM during PSBB," expressed PT LRT Jakarta Corporate Secretary, Bintang Kemal, Friday (6/5).

He stated the headway becomes shorter from 1 hour into 20 minutes. Nevertheless, it can change at any time depending on the conditions in the field.

Anies Extends Jakarta PSBB, June Becomes Transition Period

"We still consistently implement health protocols for the passengers," he stressed.

The health protocols applied include every passenger must always wear a mask and maintain physical distancing on the platform and on the train. One train car is limited to 60 passengers.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2424 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1149 personAldi Geri Lumban Tobing
  3. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye962 personAldi Geri Lumban Tobing
  4. Pramono: Jakarta Remains the Capital City Until a Presidential Decree Is Issued

    access_time13-05-2026 remove_red_eye932 personDessy Suciati
  5. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye904 personFakhrizal Fakhri