You don't have javascript enabled. Good luck with that.
Pencarian
Kereta LRT Jakarta Longgarkan Operasional Dimasa Transisi hi
.
photo Wuri Setyaningsih - Beritajakarta.id

LRT Operations Extended During PSBB Transition

PT LRT Jakarta has decided to extend its services at 5.30 AM to 9 PM in the PSBB transition to end of June in the capital. 

We still consistently implement health protocols for the passengers

"Previously we only operated from 6 AM to 6.20 PM during PSBB," expressed PT LRT Jakarta Corporate Secretary, Bintang Kemal, Friday (6/5).

He stated the headway becomes shorter from 1 hour into 20 minutes. Nevertheless, it can change at any time depending on the conditions in the field.

Anies Extends Jakarta PSBB, June Becomes Transition Period

"We still consistently implement health protocols for the passengers," he stressed.

The health protocols applied include every passenger must always wear a mask and maintain physical distancing on the platform and on the train. One train car is limited to 60 passengers.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye867 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye423 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye370 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye357 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye352 personAldi Geri Lumban Tobing
close