Transjakarta Reopens Four Non-Corridor Routes
Reported by Wuri Setyaningsih | Translated by Maria Inggita
PT. Transjakarta reopens four non-corridor routes (Non BRT) with 20 minutes headway between fleets.
The bus arrival interval is 20 minutes. We will operate these four routes gradually
PT. Transjakarta Corporate Secretary and Public Relation Division Head, Nadia Diposanjoyo conveyed, the routes reopening is carried out to serve Jakarta residents who are starting to return to their activities while adapting to the new habits.
"The bus arrival interval is 20 minutes. We will operate these four routes gradually," she said, Saturday (8/15).
Bank DKI Distributes Face Shields for Bus Transjakarta OfficersShe informed, 7A (Kampung Rambutan - Lebak Bulus) route will start to operate on August 13 with operating hours from 5 AM to 10 PM. Then, 9D (Pasar Minggu - Tanah Abang) route will operate from August 14 with operating hours from 5 AM to 10 PM.
Next, D21 (Universitas Indonesia (UI) - Lebak Bulus) route will start to operate from August 19 with operating hours from 5 AM to 10 PM. And the last, 9E (Kebayoran Lama-Grogol) route that will start to operate from August 25 with operating hours from 5 AM to 10 PM
.For those four routes, she added, Transjakarta has prepared 100 fleets that have been sterilized and ready for use. It means her side adds 25 percent from the number of fleets operated before COVID-19 pandemic.
"This number will be evaluated in stages, especially if there is a surge in passengers. We will also evaluate the acceleration of headway time to ensure health protocols implementation during the operation," she stated.