You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Jaksel Perbaiki Tiga Lokasi Trotoar di Pasar Minggu
.
photo TP Moan Simanjuntak - Beritajakarta.id

Sidewalks Repair in Pasar Minggu Targeted to Finish Next Week

The repair work of damaged sidewalks in three locations in Pasar Minggu Sub-district is targeted to complete next week. South Jakarta Bina Marga Sub-agency has carried out this repair since the end of August.

We deploy 8-10 personnel in one location to replace broken concrete blocks

South Jakarta Bina Marga Sub-agency Head, Heru Suwondo conveyed, his side is currently repaired sidewalk on Jalan Menara (Jati Padang Urban Village), Jalan Graha Elnusa, and Jerut Purut (Cilandak Timur Urban Village).

"Those sidewalk were heavily damaged. Lots of broken and missing concrete blocks," he mentioned, Thursday (9/10).

Cakung Flyover Development Process Has Reached 71 Percent

On each locations, he said, there are 10-15 damaged points with size around 5-10 meters.

"We deploy 8-10 personnel in one location to replace broken concrete blocks," he said.

So far, the repair work has reached 90 percent and targeted to finish next week.

"Thus people can be comfort and safe in using the sidewalks and to make it look beautiful," he explained.

Linked News
Popular News indeks
  1. Joint Personnel Control Green Lane in Petamburan

    access_time25-04-2024 remove_red_eye864 personBudhi Firmansyah Surapati
  2. Waste Sorting Education Given for 500 Students of SDN 07

    access_time26-04-2024 remove_red_eye686 personAnita Karyati
  3. Central Government Teams Up with Japan to Realize Jakarta with TOD Concept

    access_time25-04-2024 remove_red_eye572 personFolmer
  4. 37.25 Ton of Campaign Prop Waste in West Jakarta Recycled

    access_time26-04-2024 remove_red_eye450 personTP Moan Simanjuntak
  5. LRT Phase 1B Construction Remains Positive

    access_time27-04-2024 remove_red_eye371 personAldi Geri Lumban Tobing