You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genangan, Pemkot Jaktim Bangun Sumur Resapan di Jl DI Panjaitan

Two Infiltration Wells on Jalan DI Panjaitan have Been Completed

They (wells) are functioning properly. Hopefully they can minimize inundation and floods in the rainy season

The East Jakarta Water Resources (SDA) Sub-agency has finally completed the construction of two infiltration wells on Jalan DI Panjaitan, Jatinegara.

East Jakarta Mayor Muhammad Anwar said, the work was carried out since last week and continued with infiltration well trials.

290 Infiltration Wells Have been Made in East Jakarta Along January to September

This trial on those wells with one meter diameter and twenty meters depth was executed by filling water from a fire engine into the well. As a result, they could absorb the overflowing water in approximately 15 minutes.

"They (wells) are functioning properly. Hopefully they can minimize inundation and floods in the rainy season," he expressed, Tuesday (9/22).

He explained each well was able to hold approximately four cubic meters of water.

Even his sub-agency was going to multiply the same absorption wells in the area and in other areas by involving various parties.

"Talk about monitoring, we plan to involve the SDA Sub-agency and Bina Marga Sub-agency," he closed.

Linked News
Popular News indeks
  1. East Jakarta Satpol PP Deployed to Ensure Safe Eid Travel Period

    access_time16-03-2026 remove_red_eye1005 personNurito
  2. Car Free Night Held on Eid Eve, Be There!

    access_time19-03-2026 remove_red_eye691 personDessy Suciati
  3. Pramono Inaugurates 26 Home Renovation Units

    access_time16-03-2026 remove_red_eye661 personDessy Suciati
  4. Homecoming Travelers Surge Seen at Tanjung Priok Terminal

    access_time17-03-2026 remove_red_eye621 personAnita Karyati
  5. Health Services in Jakarta Remain Fully Operational During Nyepi and Eid al-Fitr Holidays

    access_time16-03-2026 remove_red_eye557 personTiyo Surya Sakti