You don't have javascript enabled. Good luck with that.
Pencarian
       Dinas SDA DKI Segera Mulai Pembangunan 1.000 Titik Sumur Resapan
.
photo Doc - Beritajakarta.id

SDA will Start Building 1,000 Infiltration Wells

On the second week of this September, Jakarta Water Reservoir (SDA) Agency planned to start building 1,000 infiltration wells.

The survey is still in progress and hopefully we can start the construction on the second week of September

Jakarta SDA Agency Geology and Raw Water Conservation Section Head, Aditya Putra Brata stated, currently his side is still surveying several locations to build the infiltration wells.

"About 1,000 infiltration wells will be built in parallel. It is spread in South Jakarta, East Jakarta, Central Jakarta, and West Jakarta. The survey is still in progress and hopefully we can start the construction on the second week of September," he explained, Friday (9/4).

Lancang Island Targets to Have 25 Infiltration Wells This Month

According to him, infiltration wells are not built to overcome flood in Jakarta, but also useful for replenishing groundwater thus it is maintained during dry season.

"Budget to build 1,000 infiltration wells is about Rp 5.5 billion. Each infiltration wells will have diameter 1 meter and depth maximum 3 meters," he informed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye865 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye421 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye369 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye354 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye343 personAldi Geri Lumban Tobing
close