You don't have javascript enabled. Good luck with that.
Pencarian
       Dinas SDA DKI Segera Mulai Pembangunan 1.000 Titik Sumur Resapan
.
photo istimewa - Beritajakarta.id

SDA will Start Building 1,000 Infiltration Wells

On the second week of this September, Jakarta Water Reservoir (SDA) Agency planned to start building 1,000 infiltration wells.

The survey is still in progress and hopefully we can start the construction on the second week of September

Jakarta SDA Agency Geology and Raw Water Conservation Section Head, Aditya Putra Brata stated, currently his side is still surveying several locations to build the infiltration wells.

"About 1,000 infiltration wells will be built in parallel. It is spread in South Jakarta, East Jakarta, Central Jakarta, and West Jakarta. The survey is still in progress and hopefully we can start the construction on the second week of September," he explained, Friday (9/4).

Lancang Island Targets to Have 25 Infiltration Wells This Month

According to him, infiltration wells are not built to overcome flood in Jakarta, but also useful for replenishing groundwater thus it is maintained during dry season.

"Budget to build 1,000 infiltration wells is about Rp 5.5 billion. Each infiltration wells will have diameter 1 meter and depth maximum 3 meters," he informed.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1205 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1049 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye903 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye728 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye568 personDessy Suciati