You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Crossing Hilir Jl DI Panjaitan Rampung

Crossing Channel Construction Work on Jalan DI Panjaitan Completed

It is done to anticipate flooding

The Jatinegara Sub-district Water Resources (SDA) Task Force has completed the construction of a crossing channel on Jalan DI Panjaitan Cipinang Besar Selatan, Jatinegara, East Jakarta, on Monday (10/12).

Jatinegara Sub-district SDA Task Force Coordinator Tamrizal said as many as 15 personnel were involved to build the channel as long as 100 meters with 3 meters width and 4 meters depth.

North Jakarta Prioritizes Handling of Floods in Teluk Gong

"It is done to anticipate flooding," he expressed.

He explained the channel connected the channel under Jalan DI Panjaitan to the Cipinang River.

On the upstream side or across the crossing, in Rawa Bunga Urban Village area, a 3x4-meter pond had been built with four meters depth that was conducted by the Becakayu Toll Road contractor.

"The main construction is completed already and only the finishing stage remains," he stated.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye595 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye561 personAldi Geri Lumban Tobing
  3. Pramono Confirms Permanent Bridge to Be Built in Tegal Alur

    access_time29-08-2026 remove_red_eye459 personDessy Suciati
  4. Jakarta Fine Arts and Ceramics Museum Hosts Malangan Exhibition

    access_time29-08-2026 remove_red_eye456 personFakhrizal Fakhri
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye430 personDessy Suciati