You don't have javascript enabled. Good luck with that.
Pencarian
 Petugas Membangun Terminal Sumur Resapan di Pulau Untung Jawa
.
photo Suparni - Beritajakarta.id

Infiltration Wells Terminal Built in Arsa Park's Beach

Thousand Islands Water Resources (SDA) Sub-agency built infiltration wells terminal in beach area of Arsa Park, RT 01/02, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

Infiltration wells terminal is used to protect wastewater pipe from being buried in the sand

Thousand Islands SDA Sub-agency Head, Abdul Rouf conveyed, his side made infiltration wells terminal with length of 1.55 meters, width 95 centimeters, and depth 1 meter. While the thickness of frame's edge reached 5 centimeters.

"Infiltration wells terminal is used to protect wastewater pipe from being buried in the sand, especially when waves reach the shore," he explained, Thursday (10/15).

Thousand Islands SDA Adds Biopore Infiltration Holes in Pramuka Island

His side deployed 5 personnel to build infiltration wells terminal.

"We have started the construction since Wednesday and targeted to finish today," he mentioned.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye795 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye781 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye482 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye378 personBudhi Firmansyah Surapati
  5. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye351 personTiyo Surya Sakti