You don't have javascript enabled. Good luck with that.
Pencarian
Pemasangan Tiga Pintu Air di Rawa Buaya di Targetkan Akhir Bulan Oktober
.
photo Rudi Hermawan - Beritajakarta.id

Three Sluice Gates Installation in Rawa Buaya Targeted to Finish This Month

West Jakarta Government accelerates three sluice gates installation in Mookevart River, Rawa Buaya, Cengkareng.

Currently, we are installing sluice gates and targeted to finish it by the end of this month

West Jakarta Mayor, Uus Kuswanto mentioned, those three sluice gates are installed on Jalan Dharmawanita IV, Ruko Golf Lake Residence, and Jalan H. Djairi RW 02.

"Currently, we are installing sluice gates and targeted to finish it by the end of this month," he stated, Friday (10/23).

LH Agency Ensures 28 Trash Screens on Major Rivers in Good Condition

Furthermore, his side had also finished building stilling basin, repaired sluice gates, and provided mobile pump with capacity of 150 liters per second at Carina Sayang Residence, Rawa Buaya Urban Village, Cengkareng.

"Moreover, we have deployed SDA personnel to normalize water channels on Jalan Rawa Buaya, Jalan Darma Wanita I, and Jalan Darma Wanita III," he explained.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye540 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye434 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye307 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye298 personAldi Geri Lumban Tobing
  5. Jakarta Commits to Realizing National Waste Management Pilot Project

    access_time17-02-2025 remove_red_eye294 personFolmer