You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap Jl Pademangan V Rampung Desember

Channel's Retaining Wall Repair on Jl. Pademangan V Targeted to Finish in December

Retaining wall of channel located on Jalan Pademangan V, RW 08, Pademangan Timur, Pademangan, North Jakarta is being repaired.

Personnel have been repairing it since last week

Retaining wall repair is targeted to finish in early December 2020.

Pademangan Timur Urban Village Head, Bambang Mulyanto explained, North Jakarta Water Resources (SDA) Sub-agency repairs channel's retaining wall to follow up resident's request through musrenbang.

11 SDA Personnel Repair Channel's Retaining Wall on Jl. Raya Ciracas

"Personnel have been repairing it since last week," he added, Tuesday (10/27).

According to him, personnel repair retaining wall as long as 107 meters. In this repair, they use river stone material to strengthen the foundation.

"This retaining wall has height of 2.4 meters and width 30 centimeters. The repair is targeted to finish by early December," he stated.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1060 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye995 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye966 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye929 personAldi Geri Lumban Tobing
  5. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye753 personFakhrizal Fakhri