Channel's Retaining Wall Repair on Jl. Pademangan V Targeted to Finish in December
access_time October 27 2020 09:35 PM remove_red_eye 988
Reported by Budhi Firmansyah Surapati | Translated by Maria Inggita
Reported by Budhi Firmansyah Surapati | Translated by Maria Inggita
Retaining wall of channel located on Jalan Pademangan V, RW 08, Pademangan Timur, Pademangan, North Jakarta is being repaired.
Personnel have been repairing it since last week
Retaining wall repair is targeted to finish in early December 2020.
Pademangan Timur Urban Village Head, Bambang Mulyanto explained, North Jakarta Water Resources (SDA) Sub-agency repairs channel's retaining wall to follow up resident's request through musrenbang.
11 SDA Personnel Repair Channel's Retaining Wall on Jl. Raya Ciracas"Personnel have been repairing it since last week," he added, Tuesday (10/27).
According to him, personnel repair retaining wall as long as 107 meters. In this repair, they use river stone material to strengthen the foundation.
"This retaining wall has height of 2.4 meters and width 30 centimeters. The repair is targeted to finish by early December," he stated.