You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap Jl Pademangan V Rampung Desember

Channel's Retaining Wall Repair on Jl. Pademangan V Targeted to Finish in December

Retaining wall of channel located on Jalan Pademangan V, RW 08, Pademangan Timur, Pademangan, North Jakarta is being repaired.

Personnel have been repairing it since last week

Retaining wall repair is targeted to finish in early December 2020.

Pademangan Timur Urban Village Head, Bambang Mulyanto explained, North Jakarta Water Resources (SDA) Sub-agency repairs channel's retaining wall to follow up resident's request through musrenbang.

11 SDA Personnel Repair Channel's Retaining Wall on Jl. Raya Ciracas

"Personnel have been repairing it since last week," he added, Tuesday (10/27).

According to him, personnel repair retaining wall as long as 107 meters. In this repair, they use river stone material to strengthen the foundation.

"This retaining wall has height of 2.4 meters and width 30 centimeters. The repair is targeted to finish by early December," he stated.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1134 personFakhrizal Fakhri
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye728 personAldi Geri Lumban Tobing
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye722 personAldi Geri Lumban Tobing
  4. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye678 personDessy Suciati
  5. Pramono: Independence must Be Manifested Through Concrete Action

    access_time17-08-2026 remove_red_eye675 personDessy Suciati