You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap Jl Pademangan V Rampung Desember

Channel's Retaining Wall Repair on Jl. Pademangan V Targeted to Finish in December

Retaining wall of channel located on Jalan Pademangan V, RW 08, Pademangan Timur, Pademangan, North Jakarta is being repaired.

Personnel have been repairing it since last week

Retaining wall repair is targeted to finish in early December 2020.

Pademangan Timur Urban Village Head, Bambang Mulyanto explained, North Jakarta Water Resources (SDA) Sub-agency repairs channel's retaining wall to follow up resident's request through musrenbang.

11 SDA Personnel Repair Channel's Retaining Wall on Jl. Raya Ciracas

"Personnel have been repairing it since last week," he added, Tuesday (10/27).

According to him, personnel repair retaining wall as long as 107 meters. In this repair, they use river stone material to strengthen the foundation.

"This retaining wall has height of 2.4 meters and width 30 centimeters. The repair is targeted to finish by early December," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye2023 personAldi Geri Lumban Tobing
  2. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye835 personFakhrizal Fakhri
  3. Cipete Selatan Steps Up Waste Management at the Source

    access_time12-06-2026 remove_red_eye744 personTiyo Surya Sakti
  4. Malaka Sari Fire Survivors Receive Assistance

    access_time12-06-2026 remove_red_eye571 personNurito
  5. Sumur Batu Requires Reusable Bags for Food Aid Collection

    access_time12-06-2026 remove_red_eye562 personFolmer