You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genangan di Green Garden, Sudin SDA Jakbar Buat Kolam Olakan

West Jakarta SDA Builds Stilling Basin on Jalan Kedoya Raya

West Jakarta Water Resources (SDA) Sub-agency builds stilling basin on Jalan Kedoya Raya to anticipate inundation on Jalan Green Garden, Kedoya Utara, Kebon Jeruk.

We expect stilling basin can drain water to Pisang River to avoid inundation in Green Garden

West Jakarta SDA Sub-agency Head, Purwanti Suryandari conveyed, stilling basin which is built next to gas station (SPBU) has width of 2 meters, height of 3 meters and length of 40 meters.

"We expect stilling basin can drain water to Pisang River to avoid inundation in Green Garden," she said, Monday (11/2).

Three Sluice Gates Installation in Rawa Buaya Targeted to Finish This Month

Currently, she continued, her side is currently building the stilling basin. This project is targeeted to finish in mid November.

Not only building stilling basin, but her side also normalize channel in Green Garden Housing Block A14, RT 012/05. Previously this channel was 50 centimeters wide and 30 centimeters deep, but now it is enlarged into width 150 centimeters and width 1 meter.

"We build stilling basin and enlarge the channel to overcome inundation in Green Garden," she mentioned.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye786 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye460 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye383 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye356 personNurito