Rawa Lindung Reservoir Dredged from Waste
access_time November 04 2020 08:50 PM remove_red_eye 1080
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
It has been carried out since October 27 and is targeted to be complete by the end of this year
The South Jakarta Water Resources (SDA) Sub-agency is sucking up water and dredge up mud from the Rawa Lindung Reservoir, Jalan M.
Saidi Raya, RW 05, Petukangan Selatan Urban Village, Pesanggrahan.South Jakarta SDA Sub-agency Head Mustajab said it was done in the context of normalization thus the reservoir could accommodate more water during high and long periods of rain.
Joint Personnel Deployed to Clean Situ Munjul Reservoir Area"We alert five floating pumps and four heavy equipment to the location. It has been carried out since October 27 and is targeted to be complete by the end of this year," he expressed, Wednesday (11/4).
Hopefully, it was able to minimize the overflowing waters from the reservoir and flooding when rain poured.