You don't have javascript enabled. Good luck with that.
Pencarian
20 Personel Gabingan Atasi Genangan di Kelapa Dua Wetan

Puddles in Kelapa Dua Wetan Have Started to Recede

But, at 6 PM, the condition starts to get better

Some 20 joint personnel of PPSU and Water Resources (SDA) Task Force are deployed to handle puddles on Jalan Kelapa Dua Wetan, Ciracas, East Jakarta, on Tuesday (10/27).

The same action also conducted on Jalan PKP, Ciracas.

Heavy Rain, Four RTs and Seven Roads in Jakarta Inundated

Kelapa Dua Wetan Urban Village Head Adamsyah said those roads were inundated as high as 20-25 cm, as the Jodo River connecting channel could not accommodate the water maximally.

"But, at 6 PM, the condition starts to get better," he said, Tuesday (10/27).

He explained they were often inundated as some of the drains had started to become clogged with mud and waste. It was also caused by the conditions of the Baboon Swamp Reservoir. If the reservoir conditions are high, the water in the drains was also high.

"But, when the rain subsides, the puddles recede quickly," he stated.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye784 personFakhrizal Fakhri
  2. Jakarta Regional Budget Spending Reaches Rp10.38 Trillion in Q1

    access_time17-04-2026 remove_red_eye713 personDessy Suciati
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  4. Job Absorption Rises in Jakarta

    access_time17-04-2026 remove_red_eye615 personDessy Suciati
  5. Training and Certification Boost Tourism Workforce Competitiveness

    access_time17-04-2026 remove_red_eye597 personAldi Geri Lumban Tobing