You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Keruk Lumpur Waduk Rawa Lindung
.
photo TP Moan Simanjuntak - Beritajakarta.id

Rawa Lindung Reservoir Dredged from Waste

It has been carried out since October 27 and is targeted to be complete by the end of this year

The South Jakarta Water Resources (SDA) Sub-agency is sucking up water and dredge up mud from the Rawa Lindung Reservoir, Jalan M. Saidi Raya, RW 05, Petukangan Selatan Urban Village, Pesanggrahan.

South Jakarta SDA Sub-agency Head Mustajab said it was done in the context of normalization thus the reservoir could accommodate more water during high and long periods of rain.

Joint Personnel Deployed to Clean Situ Munjul Reservoir Area

"We alert five floating pumps and four heavy equipment to the location. It has been carried out since October 27 and is targeted to be complete by the end of this year," he expressed, Wednesday (11/4).

Hopefully, it was able to minimize the overflowing waters from the reservoir and flooding when rain poured.

Linked News
Popular News indeks
  1. Pramono Prioritizes Construction of Cakung Regional Hospital

    access_time18-04-2025 remove_red_eye468 personFakhrizal Fakhri
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye408 personBudhi Firmansyah Surapati
  3. Free Transportation Services to Facilitate Residents' Mobility

    access_time17-04-2025 remove_red_eye317 personDessy Suciati
  4. Jakarta to Make Public Transportation Free on April 24, 2025

    access_time18-04-2025 remove_red_eye313 personAldi Geri Lumban Tobing
  5. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye281 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik