You don't have javascript enabled. Good luck with that.
Pencarian
 Kantor Kelurahan UKU Bangun Tiga Sumur Resapan
.
photo Nurito - Beritajakarta.id

Three Infiltration Wells Built in Utan Kayu Utara Urban Village

Three infiltration wells are being built at Utan Kayu Utara Urban Village Office's yard, Matraman, East Jakarta, on Monday (11/9).

Those three infiltration wells are built manually

Utan Kayu Utara Urban Village Head, Euis Saadah conveyed, construction of three infiltration wells had been started a week ago.

One of those infiltration wells has entered finishing stage and the other two are still in the process of excavating and installing pipe concrete (buis beton).

Nine Infiltration Wells Built at RW 01 Untung Jawa Island

"Those three infiltration wells are built manually. The pipe concrete molding process is carried out at urban village office," she mentioned.

In order to built three infiltration wells with an average depth of three meters and diameter 1.2 meters, her side deployed 10 SDA Unit personnel and Urban Village PPSU personnel.

"Hopefully those infiltration wells can minimize inundation and flood during rainy season and no shortage of water during dry season," she said.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye944 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye929 personFolmer
  4. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye769 personAldi Geri Lumban Tobing
  5. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye768 personBudhi Firmansyah Surapati