You don't have javascript enabled. Good luck with that.
Pencarian
 Kantor Kelurahan UKU Bangun Tiga Sumur Resapan

Three Infiltration Wells Built in Utan Kayu Utara Urban Village

Three infiltration wells are being built at Utan Kayu Utara Urban Village Office's yard, Matraman, East Jakarta, on Monday (11/9).

Those three infiltration wells are built manually

Utan Kayu Utara Urban Village Head, Euis Saadah conveyed, construction of three infiltration wells had been started a week ago.

One of those infiltration wells has entered finishing stage and the other two are still in the process of excavating and installing pipe concrete (buis beton).

Nine Infiltration Wells Built at RW 01 Untung Jawa Island

"Those three infiltration wells are built manually. The pipe concrete molding process is carried out at urban village office," she mentioned.

In order to built three infiltration wells with an average depth of three meters and diameter 1.2 meters, her side deployed 10 SDA Unit personnel and Urban Village PPSU personnel.

"Hopefully those infiltration wells can minimize inundation and flood during rainy season and no shortage of water during dry season," she said.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1408 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye847 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye649 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye596 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye470 personBudhi Firmansyah Surapati