You don't have javascript enabled. Good luck with that.
Pencarian
 Kantor Kelurahan UKU Bangun Tiga Sumur Resapan

Three Infiltration Wells Built in Utan Kayu Utara Urban Village

Three infiltration wells are being built at Utan Kayu Utara Urban Village Office's yard, Matraman, East Jakarta, on Monday (11/9).

Those three infiltration wells are built manually

Utan Kayu Utara Urban Village Head, Euis Saadah conveyed, construction of three infiltration wells had been started a week ago.

One of those infiltration wells has entered finishing stage and the other two are still in the process of excavating and installing pipe concrete (buis beton).

Nine Infiltration Wells Built at RW 01 Untung Jawa Island

"Those three infiltration wells are built manually. The pipe concrete molding process is carried out at urban village office," she mentioned.

In order to built three infiltration wells with an average depth of three meters and diameter 1.2 meters, her side deployed 10 SDA Unit personnel and Urban Village PPSU personnel.

"Hopefully those infiltration wells can minimize inundation and flood during rainy season and no shortage of water during dry season," she said.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye968 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye930 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye794 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye709 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye606 personAnita Karyati