You don't have javascript enabled. Good luck with that.
Pencarian
 Kantor Kelurahan UKU Bangun Tiga Sumur Resapan
.
photo Nurito - Beritajakarta.id

Three Infiltration Wells Built in Utan Kayu Utara Urban Village

Three infiltration wells are being built at Utan Kayu Utara Urban Village Office's yard, Matraman, East Jakarta, on Monday (11/9).

Those three infiltration wells are built manually

Utan Kayu Utara Urban Village Head, Euis Saadah conveyed, construction of three infiltration wells had been started a week ago.

One of those infiltration wells has entered finishing stage and the other two are still in the process of excavating and installing pipe concrete (buis beton).

Nine Infiltration Wells Built at RW 01 Untung Jawa Island

"Those three infiltration wells are built manually. The pipe concrete molding process is carried out at urban village office," she mentioned.

In order to built three infiltration wells with an average depth of three meters and diameter 1.2 meters, her side deployed 10 SDA Unit personnel and Urban Village PPSU personnel.

"Hopefully those infiltration wells can minimize inundation and flood during rainy season and no shortage of water during dry season," she said.

Linked News
Popular News indeks
  1. Survivors of Collapsed Houses in Malaka Jaya Receive Social Assistance

    access_time30-01-2025 remove_red_eye2205 personNurito
  2. Logistics Aid for Jakarta Flood Victims Keeps Being Distributed

    access_time30-01-2025 remove_red_eye982 personAldi Geri Lumban Tobing
  3. City Council Chairman Supports City Government Optimizing Assistance for Rorotan Farmers

    access_time30-01-2025 remove_red_eye674 personDessy Suciati
  4. N. Jakarta Vice Mayor Distributes Assistance to Flood Survivors in Sukapura

    access_time30-01-2025 remove_red_eye478 personAnita Karyati
  5. Rain Brings Excitement to Rawa Belong Milkfish Festival 2025

    access_time28-01-2025 remove_red_eye448 personFolmer