You don't have javascript enabled. Good luck with that.
Pencarian
 Kantor Kelurahan UKU Bangun Tiga Sumur Resapan

Three Infiltration Wells Built in Utan Kayu Utara Urban Village

Three infiltration wells are being built at Utan Kayu Utara Urban Village Office's yard, Matraman, East Jakarta, on Monday (11/9).

Those three infiltration wells are built manually

Utan Kayu Utara Urban Village Head, Euis Saadah conveyed, construction of three infiltration wells had been started a week ago.

One of those infiltration wells has entered finishing stage and the other two are still in the process of excavating and installing pipe concrete (buis beton).

Nine Infiltration Wells Built at RW 01 Untung Jawa Island

"Those three infiltration wells are built manually. The pipe concrete molding process is carried out at urban village office," she mentioned.

In order to built three infiltration wells with an average depth of three meters and diameter 1.2 meters, her side deployed 10 SDA Unit personnel and Urban Village PPSU personnel.

"Hopefully those infiltration wells can minimize inundation and flood during rainy season and no shortage of water during dry season," she said.

Linked News
Popular News indeks
  1. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye495 personAldi Geri Lumban Tobing
  2. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye430 personDessy Suciati
  3. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye420 personAldi Geri Lumban Tobing
  4. Buildings on the Sidewalk in Front of Plumpang Transjakarta Bus Stop Demolished

    access_time30-09-2026 remove_red_eye409 personAnita Karyati
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye375 personFakhrizal Fakhri